Request a quote

Industrial steel construction, welding, piping and maintenance

SIMMAX takes over critical technical scopes with experienced crews, with a focus on safety, quality and planning. Request your quote below.

Prefer to call?+32 470 40 04 46
  • Experienced crews that take over critical scopes
  • Based in Belgium, international through partners
  • Industrial clients only, no domestic work
  • From early coordination to safe commissioning

Request your quote

Tell us what you need. We will get in touch to go through the scope.

Certification and approach

  • EN 1090 for steel structures
  • VCA and VCA-P
  • ISO standards per scope
  • Safety and planning first

What we deliver

Four disciplines, one point of contact

Steel structures

Engineered steel structures, from fabrication to on-site installation, to EN 1090.

Go to the form

Welding

Welding for steel structures, piping and installations, by contractors certified according to their scope.

Go to the form

Industrial piping

Piping works for complex installations and large-scale projects, from early engineering to safe commissioning. Also tank renovations with steel fitting, welding, piping and insulation.

Go to the form

Industrial maintenance and shutdowns

Reliable industrial maintenance, shutdowns and turnarounds. Our crews take over critical technical scopes, from preparation to restart.

Go to the form

How it works

From request to execution

  1. 01

    You share the scope

    What needs doing, at which site and within what timeframe. Drawings or a specification are welcome.

  2. 02

    We get in touch

    We go through the scope, the safety requirements and the planning, and visit the site if needed.

  3. 03

    You receive a quote

    With the scope, crew deployment and planning in it, so you know what you are buying.

Our mobilisation time typically ranges from one to three weeks, depending on the scope. For smooth execution we count on a lead time of at least four weeks.

We have worked for

  • BASF
  • BESIX
  • Volvo
  • Bilfinger
  • Kelvion
  • SPIE
  • TankX
  • Verwater
  • Victor Buyck

Frequently asked questions

How quickly can you mobilise?

Depending on the project scope, our mobilisation time typically ranges from one to three weeks.

In which sectors does SIMMAX operate?

Mainly energy, data centers, oil and gas, shipbuilding, automotive and wider industry. Within those sectors we deliver engineering, welding, installation, insulation and E&I across steel structures, maintenance, piping and painting.

Do you take on both short and long projects?

Both. To ensure smooth and efficient execution, a minimum lead time of four weeks is required.

Are your people certified?

All contractors are certified according to their scope of work and operate in line with EN 1090 for steel, VCA and VCA-P for safety, and the required ISO standards.

Do you work for private individuals?

No. SIMMAX works exclusively for industrial clients and contractors. Domestic repairs, sanitary and plumbing work fall outside our services.

Ready to share your scope?

Fill in the form or call us directly. You will speak to someone who knows the execution side.